Skip to content

Solutions

Where to see your balance

Your account home and the Live Center Minutes tab both show the Standard and High-Power minutes you have left, with the earliest expiry.

Symptom

You are not sure how many runner minutes you have left — or whether the minutes you are looking at are the pool your jobs actually use.

Cause

Standard and High-Power minutes are two separate balances, not one pot. A job only ever draws from the pool it ran on, so a single number is never the whole picture: you can have plenty of Standard minutes and no High-Power minutes, or the other way round.

Fix

You can see both balances in two places:

  1. Account home: the Runner minutes card shows the minutes left in each pool, with the earliest expiry date.
  2. Live Center, Minutes tab: the same per-pool balances and earliest expiry.
  3. Before a big run, check the pool your jobs will use — Standard jobs draw the Standard balance, and High-Power jobs draw the High-Power balance.

Example

Your card shows Standard: 4,200 minutes and High-Power: 300 minutes. A Standard job that bills 10 minutes leaves Standard at 4,190 minutes — High-Power stays at 300.